Tuesday, May 14, 2019

Costs associated with ground work, brick purchasing and roofing and Essay

constitutes associated with ground work, brick purchasing and roof and cladding of the borders - Essay ExampleAssuming that workers are expected to work for eight hours a day, verbal expression work is done six days in a week the exaction work is expected to ware a total of 96 hours since the contractors program allows maximum of two weeks of excavation. Assuming similarly that, on the first day of the first week, it is only the excavator and the driver were nowadays on the berth since there would have been no material for the loader and the lorry to work on the first day. That delegacy as the excavator and general operations covered 12 days the lorry and the loader were present in the site for 11 days in the two excavation weeks cartridge holder. Assuming also, that two Lorries were employ to ferry the ache material to the tipping site and as the first lorry got loaded, it was taking the same time to and fro the site and the tipping site as loading the next lorry. Since t he distance from the excavation site to the tipping site is 5miles, by converting it to kilometers , its equal to 8 kilometers as 1 mile is equivalent to 1.6 km. Assuming the time to load the waste to be 30 minutes (0.5 hours) . Hence the lorry will travel at a revivify of 32 kilometers per hour. That means in a day the Lorries will cover 16 hinge upons, subtracting the 1 trip lost at the start of every day while loading the first lorry. The total make up to be incurred can be established as below General operation speak tos (12*8*12) =1152 Euros. Lorry and Driver (11*8*38) =3344 Euros. Wheel excavator and driver (12*8*35) =3072 Euros. Loader backhoe (11*8*32) =2816 Euros. Tipping fees (15*20*11) =3300 Euros. Therefore, the total excavation greet for the two weeks will be (1152 Euros + 3344 Euros + 3072 Euros +2816 Euros + 3300 Euros= 13684 Euros).... This research will begin with the command that the ground work of a kink includes the laying down of a buildings buns. The s et in motionation is that part of walls, piers and a column which is in direct contact with, and transmits loads to the ground. The most basic and sound requirement of a foundation is strength and stability therefore the foundation should be deep plenteous in order to foster stability of the building. The excavated soil should be transported to another site away from the construction site in order to create space. Brick work involves making of the bricks at Edenhall facing bricks and from Strawbone facing bricks. The perimeter, top and partition of the six unit workshop will determine the number of bricks to be used. The overall exist of the exercise will include the cost of material, 8% on overhead cost and profit. The perimeter of the wall is (85364* 2 +25464 *2) =221656mm. The lump sum price fares to 121000 pounds while scaffolding costs 10,000. So the net amount for the rest part of work is (121000-10000) = 111000 pounds. This is the amount that will be spent on buying the materials and the cost of labor. Cost of materials delivered to the site in roofing and wall cladding phase can be found by working on this equation (number of sheets*price per sheet) + (number of Plastic headed stainless steel screws* price per unit) i.e. (n.s*p.s) + (n.ps*p.u)Cost of labor will be equated as following (labour cost of cladding the wall +labour cost of roofing, i.e. ( c.cw+c.r).

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.